
Base support, summer 2015 (Brazilian undergraduate
interns: M. Pacheco and E. Frazao, ) |
|

Sand tank arrival, fall 2015 ( graduate students: D. Goff,
"Ru", M. Morrison) |
|

Highly-permeable pebble base layer |
|
Sand tank filled with sorted sand; X-axis gantry visible,
fall 2016 (graduate students: B. Odom, N. Benton) |
|

Y-axis gantry under construction |
|

Y-axis gantry installed, spring 2017 (graduate students:
M. Morrison, B. Odom, N. Benton) |
|

Three-axis robotic gantry, spring 2018 |
|
|